TABLE 1
CZECH REPUBLIC:  PRODUCTION OF MINERAL COMMODITIES1
(Metric tons unless otherwise specified)
 
Commodity2   1999   2000   2001   2002   2003  
METALS
Aluminum, secondarye   40,000 40,000 20,000 20,000 20,000
Copper, refined, secondarye   23,037 2 20,000 18,000 18,000 18,000
Gold metal kilograms 3,207 3,000 e 2,000 2,000 e 1,000 e
Iron and steel:  
   Iron ore:  
      Gross weight thousand tons 23 21 20 -- -- e
      Fe contente   6,000 6,000 6,000 -- --
   Metal:  
        Pig iron thousand tons 4,022 4,621 6,316 4,840 5,200
        Ferroalloys, total electric furnacee do. 1 1 1 1 --
        Steel, crude do. 6,107 6,216 6,316 6,512 6,800
        Semimanufactures do. 10,207 11,637 12,645 12,500 e 12,500 e
Lead, metal, secondarye   29,280 2 25,000 25,000 25,000 20,000
Silvere   24 2 25 25 25 25
Uranium, mine output, U content   605 498 490 477 458
Zinc, metal, secondarye   145 2 150 250 250 250
INDUSTRIAL MINERALS
Cement, hydraulic thousand tons 4,241 4,093 3,550 3,217 3,465
Clays:  
    Bentonite do. 160 280 224 174 199
    Kaolin do. 5,183 5,573 5,543 3,650 4,155
    Other do. 1,070 1,120 585 564 550 e
Diamond, synthetice carats 5,000 5,000 5,000 5,000 5,000
Diatomite   37,000 34,000 83,000 28,000 30,000 e
Feldspar   244,000 337,000 373,000 401,000 421,000
Fertilizer, manufactured:  
    Nitrogenous, N content   220,000 257,000 250,000 e 250,000 e 251,000
    Phosphatic, P2O5 contente   100,000 100,000 100,000 100,000 100,000
    Potassic, K2O contente   20,000 20,000 20,000 20,000 20,000
    Mixed   77,000 75,000 75,000 e 75,000 36,000
Gemstones, crude, pyrope-bearing rock   54,000 62,000 47,000 52,000 50,000 e
Graphite   22,000 23,000 17,000 16,000 9,000
Gypsum and anhydrite, crude   136,000 82,000 24,000 108,000 104,000
Lime, hydrated and quicklime thousand tons 1,142 1,202 1,300 1,120 1,263
Nitrogen,  N content of ammoniae   250,000 250,000 206,000 r 215,000 r 235,000
Quartz   3,000 -- -- -- --
Sand and gravel:  
    Common sand and gravel thousand cubic meters 12,781 12,640 12,100 12,464 13,400
    Foundry sand thousand tons 717 829 771 476 r 712
    Glass sand do. 980 985 974 853 904
Stone:  
    Basalt (for casting)   89,000 14,000 15,000 e 14,000 r 13,000
    Dimension stone thousand cubic metersr 300,000 320,000 300,000 285,000 280,000 e
    Limestone and other calcareous stones thousand tonsr 11,703 11,808 10,887 10,186 10,236
    Building stone thousand cubic metersr 9,442 9,451 10,500 10,600 12,500
Sulfur, byproducts, all sourcese   40,000 40,000 40,000 40,000 40,000
Sulfuric acid   350,000 350,000 220,200 240,524 239,000
MINERAL FUELS AND RELATED MATERIALS
Coal:  
    Bituminous thousand tons 17,227 17,028 14,808 14,097 13,382
    Brown and lignite do. 45,370 51,063 51,643 49,335 50,390
Coke do. 3,340 3,411 3,519 3,536 3,556
Fuel briquets from brown coal do. 288 253 280 302 314
See footnotes at end of table.
TABLE 1--Continued
CZECH REPUBLIC:  PRODUCTION OF MINERAL COMMODITIES1
(Metric tons unless otherwise specified)
 
Commodity2   1999   2000   2001   2002   2003  
MINERAL FUELS AND RELATED MATERIALS--Continued
Gas:  
    Manufactured, all typese million cubic meters 800 800 800 800 800
    Natural, marketed3 do. 143 118 101 91 131
Petroleum:  
    Crude:   
        As reported thousand tons 176 168 178 253 310
        Converted thousand 42-gallon barrels 1,197 1,142 1,100 e 1,620 e 1,984
Refinery productse do.   35,000   35,000   35,000   35,000   35,000
eEstimated; estimated data are rounded to no more than three significant digits.  rRevised.  -- Zero.
1Table includes data available through September 2004.  In addition to the commodities listed, arsenic, dolomite, illite, sodium compounds, talc, and zeolite
are produced, but information is inadequate to make reliable estimates of output levels.
2Reported figure.
3Includes gas produced from coal mines.  Gross output of natural gas is not reported, but is believed to exceed reported marketed output by an inconsequential
amount.