Internal Data Search by Location
Kinder Morgan Commits to Pipe Linking Oil-Sands Crude to Asian Markets
Kinder Morgan Inc. has committed to expanding a pipeline that will allow Canadian crude to be exported to Asia, a controversial C$7.4 billion ($5.5 billion) project that’s set to face revitalized opposition amid political upheaval in the nation’s Pacific Coast province.
Revision Date: 6/14/2017
Tags: 211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Kinder Morgan, Pipeline, Expansion, Commitment, Export, Production Capacity, Pipeline, Canada, Canada
The Basics of a Compressor Station/Prince Rupert Natural Gas Transmission Pipeline Project
As natural gas flows along a pipeline, it slows due to friction between it and the pipeline. This results in a loss of pressure along the pipeline. In order to make the gas flow continuously at a desired flow rate, it is re-pressurized at suitable locations along the pipeline. This is done by mechanically compressing the gas at sites connected to the pipeline known as compressor stations. The location and quantity of compressor stations required in a pipeline system is dependent on a number of factors, including the operating pressure of the pipeline, the diameter of the pipe used, elevation changes along the pipeline route and the desired volume of gas to be transported
Revision Date: 10/25/2016
Tags: 211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, TransCanada, Pipeline, Compressor Stations, Compression, Pipeline, Transmission, Canada