Major CCS Projects:  Coal-Fired Power

 

 

PROJECT

 

 

CAPTURE

 

STORAGE

 

STATUS

Project Name

Developer

Country

Plant Size (MW)

Unit

Startup

CO2 Demo Size

CCS

Startup

Capture Process

CO2 Capture

(tpy)

Percent Capture

Capture

Vendor

Oxygen/

Purify Vendor

Transpo

Method

Transpo

Distance

(km)

Storage

(M tpy)

Storage

Vendor

Primary Use or Storage

CCS Status

Capital

Cost

($ M)

Comments

Callide-A

CS Energy

Australia

1,500

1988-2002

30

2010

Oxy Combustion

30,000

 

IHI

Air Liquide

Truck

300

0.03

Schlum-berger

On-Shore

Construction

240

Unit A has been out of service since 2001; Being reactivated and converted to oxy combustion with carbon capture

Coolimba-CFB

Aviva Corporation

Australia

400

2015

400

2015

Oxy Combustion

3,000,000

90

 

 

 

 

 

 

Under Investi-gation

Planning

1,200

Will build on experience of Callide-A demo

Hazelwood

International Power

Australia

1,600

1964-1971

 

2009

Amine

10,000

 

 

 

 

 

N/A

 

Waste water treatment

Operational

340

Slipstream from 200 MW unit; Pilot started up July 2009; CO2 used to treat ash water, converts to calcium carbonate

         Project Name: Compostilla Endesa

                                         Developer: Endesa Generation
                                         Location: Spain
                                         Facility Type: Coal-fired Power
                                         Plant Size MW: 500
                                         Unit Startup: 2015
 
                                         CO2 Demo Size: 500
                                         CCS Startup: 2015
                                         Capture Process: Oxy Combust
                                         CO2 Capture (tpy): 2750000
                                         Percent Capture:  
                                         Capture Vendor:  

                                         Oxygen/Purify Vendor:  
                                         Transportation Method: Pipeline
                                         Transportation Distance (km): 80
                                         Storage (M tpy): 2.75
                                         Storage Vendor:  
                                         Storage Type: Saline Aquifer

                                         CCS Status: Planning
                                         Capital Cost ($ M): 300

Comments: 
New CFB oxy-fuel boiler with CCS; Awarded €180 million in EU funding