Major CCS Projects: Coal-Fired Power
PROJECT
|
CAPTURE |
STORAGE |
STATUS |
||||||||||||||||
Project Name |
Developer |
Country |
Plant Size (MW) |
Unit Startup |
CO2 Demo Size |
CCS Startup |
Capture Process |
CO2 Capture (tpy) |
Percent Capture |
Capture Vendor |
Oxygen/ Purify Vendor |
Transpo Method |
Transpo Distance (km) |
Storage (M tpy) |
Storage Vendor |
Primary Use or Storage |
CCS Status |
Capital Cost ($ M) |
Comments |
Callide-A |
CS Energy |
Australia |
1,500 |
1988-2002 |
30 |
2010 |
Oxy Combustion |
30,000 |
|
IHI |
Air Liquide |
Truck |
300 |
0.03 |
Schlum-berger |
On-Shore |
Construction |
240 |
Unit A has been out of service since 2001; Being reactivated and converted to oxy combustion with carbon capture |
Coolimba-CFB |
Aviva Corporation |
Australia |
400 |
2015 |
400 |
2015 |
Oxy Combustion |
3,000,000 |
90 |
|
|
|
|
|
|
Under Investi-gation |
Planning |
1,200 |
Will build on experience of Callide-A demo |
Hazelwood |
International Power |
Australia |
1,600 |
1964-1971 |
|
2009 |
Amine |
10,000 |
|
|
|
|
|
N/A |
|
Waste water treatment |
Operational |
340 |
Slipstream from 200 MW unit; Pilot started up July 2009; CO2 used to treat ash water, converts to calcium carbonate |
Project Name: Compostilla Endesa
Developer: Endesa
Generation
Location: Spain
Facility Type: Coal-fired Power
Plant Size MW: 500
Unit Startup: 2015
CO2 Demo Size: 500
CCS Startup: 2015
Capture Process: Oxy Combust
CO2 Capture (tpy): 2750000
Percent Capture:
Capture Vendor:
Oxygen/Purify Vendor:
Transportation Method: Pipeline
Transportation Distance (km): 80
Storage (M tpy): 2.75
Storage Vendor:
Storage Type: Saline Aquifer
CCS Status: Planning
Capital Cost ($ M): 300
Comments: |