GEA has supplied more than 6000 MW of dense slurry systems
The very first, then intermittently operated Circumix system was installed in 1990 in Hungary, followed by the first continuous operation mixer in 1992. The first real large-scale system was installed in the Mátra Power Station in 1998 and has been working trouble free since. Mátra was also the first power station where, after a major upgrade in 2000, FGD by-products were also handled by the Circumix DSS. The first overseas project was commissioned in 2003 in the Jacksonville North Side Generating Station, in the USA in Florida. By 2014 the Circumix systems served over 6,000 Mwe coal fired power plant capacity and have safely processed and deposited more than 60 million cubic meters of dense slurry. NAES is the partner in North America. The Mcilvaine CCR decision guide includes a presentation by Dale Timmons of NAES.
Revision Date: 6/27/2019