Resin wafer-electrodeionization for flue gas carbon dioxide capture

A DOE funded program to capture and release SO2 using a progression of water purification technologies including ion exchange, electrodialysis and electrodeionization.

Revision Date:  8/9/2011

Tags:  221112 - Fossil Fuel 化石燃料, Argonne National Laboratory, Nalco, Electrodialysis, Electrodeionization, Ion Exchange, Air Quality, Global Warming, CO2 Capture


B&W has SaskPower Order for Boundary Dam Life Extension

Babcock & Wilcox Canada Ltd. (B&W Canada) has been awarded a $107 million contract from SaskPower to engineer, manufacture, deliver and construct critical components for SaskPower's Boundary Dam Unit 3 in Estevan, Saskatchewan. The boiler retrofit for Boundary Dam Unit 3 is an integral part of the plant's life extension and conversion to allow for the capture of carbon dioxide through SaskPower's Integrated Carbon Capture and Storage Demonstration Project. , B&W Canada will engineer and supply all heat transfer surfaces and a new combustion system with low-NOx technology to provide SaskPower's Boundary Dam with a 30-year life extension and improved plant performance. The project is expected to be completed in August 2013. This posting is courtesy of Industeel, a supplier of steel for boilers and other power plant components. www.babcock.com

Revision Date:  5/25/2011

Tags:  221112 - Fossil Fuel 化石燃料, SaskPower, Industeel, Babcock & Wilcox, Low NOx Burner, Boiler, NOx, CO2 Capture