Internal Data Search by Location

Data Search on:

Emerson Actuator replacement solves turbine bypass problem

As often as four times a year during winter months, a power plant in Wisconsin would miss a scheduled start of its combined cycle power plant due to malfunctions of the turbine bypass valves. This article describes how the problems were solved by replacing the actuation components on those valves.

Revision Date:  10/17/2019

Tags:  221118 - Other Electric Power , 211111 - Crude Petroleum and Natural Gas Extraction 原油和天然气开采, Emerson Electric, Valve, USA


Valley Power Must Remove Mercury and Phosphorous from Wastewater Discharges

 

Revision Date:  12/19/2012

Tags:  Wisconsin Electric Power, Water Treatment System, World Power Generation, USA


Field Experience with a New CEDI Module Design: Wisconsin Power and Light

 

Revision Date:  8/8/2011

Tags:  221112 - Fossil Fuel 化石燃料, Evoqua Water Technologies, Evoqua Water Technologies, Wisconsin Power and Light, Alliant Energy, Electrodeionization, Boiler Feedwater, USA