Internal Data Search by Location

Data Search on:

Sargent & Lundy Turns to Fisher Sever Service Group for Sky Vent Solution that Reduces Noise, Vibration and Costs

This case study describes a sky vent solution for a heat recovery steam generator (HRSG) which addresses noise and vibration concerns at a combined cycle power plant in Texas. The solution incorporated a whisper Trim III noise attenuating flow cage along with a downstream diffuser.

Revision Date:  9/8/2014

Tags:  221112 - Fossil Fuel 化石燃料, Emerson Process Management, Sargent & Lundy, Heat Recovery Steam Generator, Control Valve, Valve, Noise, Vibration, USA


Temple Combined Cycle Expansion-Panda Power

Panda Power Funds completed financing on a 758 MW expansion of its natural gas-fueled combined cycle power plant currently under construction in Temple, Texas. When completed, the Temple I and II generating stations will have a combined capacity of 1,516 MW. The Temple II facility is scheduled to enter commercial operation by the summer of 2015.

Revision Date:  4/15/2013

Tags:  221112 - Fossil Fuel 化石燃料, Siemens, Bechtel, Project, World Power Generation, USA


Mitchell Combined Cycle Plant-FGE Texas

FGE Texas LLC, a wholly owned subsidiary of FGE Power LLC, has announced plans to build a new 726 MW gas-fired power plant in Mitchell County, Texas. The 2x1 combined cycle power plant will use Alstom Thermal Power's next generation KA-24 platform and is due to be one of the most efficient gas plants in the Electric Reliability Council of Texas (ERCOT). Construction is scheduled to begin in 2013 and the new plant should begin commercial operation in 2016.

Revision Date:  4/15/2013

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, FGE Power, Gas Turbine, Project, World Power Generation, USA


Summit Power (Texas Clean Energy) Will Use Scrubber and Wastewater Treatment

The Venturi scrubber system will require lots of wastewater treatment. Siemens has systems with two venture scrubbers and a demister all with bleed streams to wastewater treatment

Revision Date:  3/12/2013

Tags:  221112 - Fossil Fuel 化石燃料, Sinopec, Fluor Corporation, Siemens, Summit Power Group, Linde Engineering, Gasifier, Venturi Scrubber, Project, IGCC, USA


Summit Power IGCC Moving Forward

Summit Power Group said the IGCC power project near Penwell, TX, is still in the works. A Memorandum of Understanding signed last September with Sinopec Engineering Group and The Export-Import Bank of China slowed proceedings. As soon as financing is in place, the company plans to break ground on the project, perhaps in late summer.

Revision Date:  3/12/2013

Tags:  221112 - Fossil Fuel 化石燃料, Fluor Corporation, Linde Engineering, Siemens, Sinopec, Summit Power Group, Project, IGCC, USA


Brownsville Combined Cycle Plant-Tenaska Brownsville Public Utilities

Tenaska and the Brownsville Public Utilities Board (BPUB) have entered into a development and purchase agreement for construction of a proposed 800 MW natural gas-fired combined cycle station in Brownsville, Texas. Tenaska could begin construction as early as 2014, with completion as early as 2016.

Revision Date:  3/1/2013

Tags:  221112 - Fossil Fuel 化石燃料, Tenaska, Brownsville Public Utilities Board, Project, World Power Generation, USA


Advatech Designs Zero Liquid Discharge Systems As Well As Scrubbers

Advatech is a joint venture between URS and Mitsubishi. They have sold many scrubber systems in the U.S. Mitsubishi is the largest scrubber supplier world wide. They are now emphasizing their water management abilities including zero liquid discharge. Advatech Water Management: As concerns mount over the quality and quantity of our water supply, regulatory limits on water usage and discharge grow more stringent. In many instances, water usage brings with it a significant expense, and going to Zero Liquid Discharge (ZLD) is either a necessity or an expected near-term requirement. ADVATECH has designed wet FGD systems for chloride concentrations up to 50,000 ppm so that the only source of purge is the free moisture in the disposal-grade gypsum. However, this approach can incur a hefty cost in the form of materials of construction and decreased limestone reactivity. To minimize cost, we have been at the forefront in developing low-capital technologies capable of eliminating liquid discharge from wet FGD while maintaining chloride levels in a reasonable range, all this without the need for an expensive and complicated wastewater treatment process.

Revision Date:  2/20/2013

Tags:  221112 - Fossil Fuel 化石燃料, 221118 - Other Electric Power , Advatech, FGD, Zero Liquid Discharge System, OEM Prospect, Wastewater Treatment, USA


Temple Combined Cycle-Panda Power Funds

Bechtel, along with representatives from Panda Temple Power, LLC, an affiliate of Panda Power Funds, Siemens, and federal, state, and local dignitaries celebrated the groundbreaking of the Panda Temple Project. It was also announced that GE will be installing its zero liquid discharge (ZLD) wastewater treatment system at the 758 MW combined cycle plant. Once commissioned, the Temple plant will use treated water from a nearby wastewater treatment plan.

Revision Date:  2/13/2013

Tags:  221112 - Fossil Fuel 化石燃料, Panda Power, GE, Bechtel, Siemens, Zero Liquid Discharge System, Project, Zero Liquid Discharge, Wastewater Reuse, World Power Generation, USA


Sherman Combined Cycle Power Plant--Panda

Panda Power Funds was joined Nov. 8, 2012 by officials from across the Lone Star State to break ground on the company’s 758-megawatt natural gas-fueled, combined-cycle power plant in Sherman, Texas. It was also announced that GE will be installing its zero liquid discharge (ZLD) wastewater treatment system at the plant.

Revision Date:  2/13/2013

Tags:  221112 - Fossil Fuel 化石燃料, Siemens, Bechtel, GE, Panda Power, Zero Liquid Discharge System, Project, Zero Liquid Discharge, World Power Generation, USA


Water Recycling Technology to Help two Texas Power Plants Reduce Water Usage

 

Revision Date:  1/30/2013

Tags:  GE Power & Water, Bechtel, Crystallizer, Brine Concentrator, Zero Liquid Discharge System, Wastewater Treatment, Oil & Gas, USA


Coronado Ventures to Build 700 MW Natural Gas-fired Power Plant in Edinburg, Texas

Coronado Ventures has received approval from the Edinburg, Texas, city council to construct a 700 MW natural gas-fired power plant, according to The Monitor. Construction of the $650 million power plant is expected to take three years.

Revision Date:  12/4/2012

Tags:  221112 - Fossil Fuel 化石燃料, Coronado Ventures, Project, World Power Generation, USA


Big Cajun II to Convert One Unit to Natural Gas, install DSI on Unit 1, ACI, and SNCR

 

Revision Date:  12/4/2012

Tags:  Louisiana Generating, NRG Energy, Water Intakes, Activated Carbon, Electrostatic Precipitator, World Power Generation, USA, USA, USA


CPS San Antonio using Flygt mixers to solve water intake problem

Installation of Flygt Mixers solves problem of muck buildup on pump station intake structure floor

Revision Date:  2/3/2012

Tags:  221112 - Fossil Fuel 化石燃料, Xylem, CPS Energy, Flygt, Mixer, Intake Water, Sludge Removal, USA