Internal Data Search by Location

Data Search on:

Verantis Is a Mid Size Scrubber System Supplier with Some Recent Orders

Verantis is a good OEM prospect directly for DCS and instruments. It will also buy some wastewater treatment equipment but also can be a collaborator where the customer is doing is on wastewater treatment. The customer will not buy the scrubber unless he knows how he is going to handle the waste water

Revision Date:  2/25/2013

Tags:  221112 - Fossil Fuel 化石燃料, 221118 - Other Electric Power , Verantis, Scrubber, OEM Prospect, Wastewater Treatment, USA


4 Gas Turbines (870 MW) Planned for FirstEnergy Eastlake, Ohio Plant

FirstEnergy Corp. and American Municipal Power (AMP) have a deal to build natural gas-fired combustion turbines in Eastlake, OH, at the site of the company's existing coal-fired Eastlake power plant. AMP would pay for the project, but sell a 25 percent share back to FirstEnergy when the new facility begins operation in early 2016. FirstEnergy, in turn, would operate and maintain the turbines.

Revision Date:  11/27/2012

Tags:  221112 - Fossil Fuel 化石燃料, FirstEnergy, American Municipal Power, Project, World Power Generation, USA


Discussions with Plate Fabricators at Coal-Gen, August, 2011

These companies are using stainless plate up to ½ thick. We have contacts in the text. C276 lining is Chatanooga boiler solution for 2205.

Revision Date:  8/21/2011

Tags:  221112 - Fossil Fuel 化石燃料, Horn Industrial Services, Caldwell Tank, Ameco, Industeel, Chattanooga Boiler & Tank, Advanced Tank, Fisher Tank, Stainless Steel, Fabricator, Air Quality, Sale, Wastewater, Fabrication, FGD, USA