Internal Data Search by Location

Data Search on:

Dover Combined Cycle (Cricket Valley)-Advanced Power Services

The New York State Public Service Commission has approved a proposed 1,000 MW natural gas-fired power plant. GE will supply 7FA gas turbine technology and the steam turbines for the project. Construction of the power plant could potentially begin in 2014.

Revision Date:  2/28/2013

Tags:  221112 - Fossil Fuel 化石燃料, Cricket Valley Energy Center, Advanced Power, GE, Gas Turbine, Continuous Emissions Monitor, Steam Turbine, Air Cooled Condenser, Project, Monitoring, Cooling, World Power Generation, USA


Valley Will Use Treated Wastewater for Boiler Feed and Will Have Small Wastewater Treatment System

This project will use treated wastewater for boiler feed water and will use air cooled condensers from the Middletown sewage treatment plants. There will be a wastewater treatment systems for blowdown from the HRSG systems, for discharge from the oil , water separator, backwash from demineralizer microfiltration unit and others.

Revision Date:  11/13/2012

Tags:  221112 - Fossil Fuel 化石燃料, Competitive Power Ventures, Wastewater Reuse, Boiler Feedwater Treatment, World Power Generation, USA


Design, Construction and Operation of a 6,730 gpm RO/CEDI System for Con Edison’s East River Repowering Project

 

Revision Date:  8/8/2011

Tags:  221112 - Fossil Fuel 化石燃料, Evoqua Water Technologies, Evoqua Water Technologies, Consolidated Edison Company of New York, Electrodeionization, Reverse Osmosis, Boiler Feedwater, USA