Internal Data Search by Location
Longking Designs Multi-Unit Dry FGD towers at Sangang Plant
The Sanming Steel and Iron Mill, which has been open since 1958, commissioned the first ever multi-unit tower in 2008. The multi-unit tower lowered both initial investment and operating costs for the dry sintering project. The project is 95% efficient at removing SO2 and handles 1.26 million cubic meters of Flue Gas an hour. 三钢集团180m2+200m2烧结机干法脱硫工程(两机一塔) 机组容量:180m2 + 200m2 系统流程:LJS干法脱硫→布袋除尘器→脱硫风机→烟囱 处理烟气量:1,260,000 m3/h 脱硫效率:95% 出口粉尘浓度:50mg/Nm3 投运时间:2008年11月
Revision Date: 8/7/2014
Tags: 221112 - Fossil Fuel 化石燃料, Sangang, Longking, Dry FGD, Desulfurization, China