Ontario Hydro converts 135 MW unit to biomass
The capital expenditure for the conversion of Thunder Bay Unit 3 was approximately $3M (Canadian dollars), resulting in a specific capital investment of less than $25/kW (Canadian dollars, net capacity).
Revision Date: 7/16/2019
Tags: 221117 - Biomass Power , Ontario Hydro, Precipitator, Canada
Eastern Power Limited has taken another step on the road to building a $360-million natural gas-fired power plant in St. Clair Township, Ontario, Canada. The company has completed an environmental review of the 300 MW project. Eastern Power is looking at two sites on Oil Springs Line, including one on the Lambton Generating Station property. The second is just a short distance to the east.
Revision Date: 11/27/2012
Tags: 221112 - Fossil Fuel 化石燃料, Eastern Power Ltd, Project, World Power Generation, Canada
Flygt Submersible Slurry Pumps Used in Canadian Power Plant
Flygt slurry pumps replace old pumps at Nanticoke GS, a coal-fired generating plant located on the shores of Lake Erie and owned by Ontario Power Generation. Two Flygt submersible HS 5550 abrasion resistant slurry pumps with a capacity of 240 l/s were purchased to pump water containing ash. They were placed in the bottom ash sump. The plant had another Flygt pump that moved water containing coal particles from the coal storage runoff ditches on site.
Revision Date: 11/7/2011
Tags: 221112 - Fossil Fuel 化石燃料, Xylem, Flygt, Ontario Power Generation, Submersible Pump, Slurry Pump, Bottom Ash Water, Coal Storage Runoff Water, Canada