Internal Data Search by Corporation Name

Data Search on:   GDF Suez

The titles below have an association with your requested corporate name

Power from Biomass to Grow 250% in 10 Years

Combustion of biomass poses a number of problems, particularly in utility scale boilers. The circulating fluidised bed has features that control ash agglomeration, fouling, and corrosion, and therefore make it particularly suitable for biomass applications, with inherent characteristics that favour low emissions. The technology also has considerable potential for scale up, and adoption of greatly improved steam conditions say Robert Giglio and Timo Jäntti of Sumitomo SHI FW Worldwide power generation capacity using woody biomass and agricultural biomass wastes is projected to grow by a factor of more than 2.5 from 2015 to 2025. Since 2008, over twenty 100% biomass fuelled CFB plants employing Sumitomo SHI FW technology have been commissioned. The largest operating utility scale ABC installation to date, the 205 MWe Polaniec plant of GDF Suez Energia Polska plant, located in Poland, has been in commercial operation since 2012.

Revision Date:  12/17/2018

Tags:  221117 - Biomass Power , Sumitomo Corp, GDF Suez, Boiler, Modern Power Systems


Fly Ash Ponds and Wastewater Treatment by Naomi Levy, Infilco Degremont - Hot Topic Hour May 3, 2011.

Naomi described treatment options for both the flyash and the flyash pond leachate.

Revision Date:  5/3/2012

Tags:  221112 - Fossil Fuel 化石燃料, Infilco Degremont, Wastewater Treatment System, Flyash Pond, Regulation, Wastewater Treatment


Flyash Pond and Wastewater Treatment - Part I - Hot Topic Hour May 3, 2012

Status of proposed federal and state regulations and what will need to be done to comply with the regulations and systems and technology for eliminating wet ash handling and slurry storage in ponds. Reduction of wastewater volume as well as treat wastewater generated.

Revision Date:  5/3/2012

Tags:  221112 - Fossil Fuel 化石燃料, Sargent & Lundy, John Ward, Inc., Infilco Degremont, FLSmidth, Flyash Separation System, Wastewater Treatment System, Flyash, Regulation, Flyash Pond, Wastewater Treatment


Degremont sells biological treatment systems for FGD wastewater

The Degremont system for removing selenium and nitrates from FGD wastewater includes both aerobic and anaerobic stages. Sand filters, mixers filter presses, clarifiers are utilized.

Revision Date:  12/5/2011

Tags:  221112 - Fossil Fuel 化石燃料, Degremont Technologies, Xylem, Aerobic Digester, Sand Filter, Clarifier, Filter Press, Mixer, Anaerobic Digester, Air Quality, Wastewater, FGD, Wastewater Treatment


Wastewater Treatment Systems presented by Naomi Levy, Infilco Degremont - Hot Topic Hour June 16, 2011.

Naomi Levy of Infilco Degremont discussed the many wastewater treatment systems which the company has supplied to treat power plant wastewater. A large system for Conemaugh is now under construction. Biological treatment can be added to the physical/chemical equipment when it is necessary to remove large quantities of selenium.

Revision Date:  6/16/2011

Tags:  221112 - Fossil Fuel 化石燃料, Infilco Degremont, Wastewater Treatment System, Toxic Metal, Wastewater Treatment


FGD Wastewater Treatment Webinar - Hot Topic Hour June 16, 2011

Speakers discussed their experience with developing, testing, designing and troubleshooting treatment technologies for FGD wastewater.

Revision Date:  6/16/2011

Tags:  221112 - Fossil Fuel 化石燃料, Brooks Rand Labs, GE Power & Water, Veolia Water Solutions & Technologies, Evonik Degussa GmbH, Infilco Degremont, Wastewater Treatment Chemical, Testing, Mercury, Toxic Metal, Wastewater Treatment


Electric Power Conference, Chicago, Illinois, May 10-12, 2011 / Exhibitors

A number of air pollution system and coal fired boiler component suppliers, as well as some water oriented companies, will be exhibiting.

Revision Date:  3/9/2011

Tags:  221112 - Fossil Fuel 化石燃料, NeuCo, Metso, NWL Transformers, Nalco Mobotec, Milton Roy, Layne Christensen, KSB, Oak Park Chimney, KE Burgmann, Siemens Energy, Johnson Matthey, Horn Industrial Services, Kiewit Power Engineers, Paragon Airheater Technologies, Pennsylvania Crusher, Praxair, Roberts & Schaefer, CoaLogix, SOLVAir Solutions, SPX Flow Technology, Zachry, Veolia ES / Special Services, Swan Analytical Instruments, Hitachi Power Systems America, Hadek, Curtiss-Wright, International Chimney, Ovivo USA, Whiting Corporation, Vector Construction, Pentair Flow Technologies, Titan Fabrication, Sulzer Turbo Services, Pullman Energy Services, Nickel Systems, National Steel Erection, Air - Cure, Masaba Mining Equipment, National Steel City, Heyl & Patterson, FMC Corporation, East Jordan Iron Works, Degremont Technologies, Day & Zimmermann, Cambria Contracting, Burns & McDonnell, BRUKS Rockwood, Babcock & Wilcox, Grindex Pumps, Clyde Bergemann, Allied Environmental Solutions, Fujikin, Fuel Tech, FLSmidth, Everlasting Valve, Endress + Hauser, Eaton, DustMASTER Enviro Systems, Dustex, Donaldson, Graycor, Infilco Degremont, GE Energy, Chemco Systems, Calgon Carbon, Blome International, Barnhart Crane & Rigging, Apollo Valves, Atlas Copco, USA


Electric Power Conference, Chicago, Illinois, May 10-12, 2011 / Exhibitors

A number of air pollution system and coal fired boiler component suppliers, as well as some water oriented companies, will be exhibiting.

Revision Date:  3/9/2011

Tags:  221112 - Fossil Fuel 化石燃料, NeuCo, Metso, NWL Transformers, Nalco Mobotec, Milton Roy, Layne Christensen, KSB, Oak Park Chimney, KE Burgmann, Siemens Energy, Johnson Matthey, Horn Industrial Services, Kiewit Power Engineers, Paragon Airheater Technologies, Pennsylvania Crusher, Praxair, Roberts & Schaefer, CoaLogix, SOLVAir Solutions, SPX Flow Technology, Zachry, Veolia ES / Special Services, Swan Analytical Instruments, Hitachi Power Systems America, Hadek, Curtiss-Wright, International Chimney, Ovivo USA, Whiting Corporation, Vector Construction, Pentair Flow Technologies, Titan Fabrication, Sulzer Turbo Services, Pullman Energy Services, Nickel Systems, National Steel Erection, Air - Cure, Masaba Mining Equipment, National Steel City, Heyl & Patterson, FMC Corporation, East Jordan Iron Works, Degremont Technologies, Day & Zimmermann, Cambria Contracting, Burns & McDonnell, BRUKS Rockwood, Babcock & Wilcox, Grindex Pumps, Clyde Bergemann, Allied Environmental Solutions, Fujikin, Fuel Tech, FLSmidth, Everlasting Valve, Endress + Hauser, Eaton, DustMASTER Enviro Systems, Dustex, Donaldson, Graycor, Infilco Degremont, GE Energy, Chemco Systems, Calgon Carbon, Blome International, Barnhart Crane & Rigging, Apollo Valves, Atlas Copco, USA