Sherman Combined Cycle Power Plant--Panda
Panda Power Funds was joined Nov. 8, 2012 by officials from across the Lone Star State to break ground on the company’s 758-megawatt natural gas-fueled, combined-cycle power plant in Sherman, Texas. It was also announced that GE will be installing its zero liquid discharge (ZLD) wastewater treatment system at the plant.
Revision Date: 2/13/2013
Tags: 221112 - Fossil Fuel 化石燃料, Siemens, Bechtel, GE, Panda Power, Zero Liquid Discharge System, Project, Zero Liquid Discharge, World Power Generation, USA
Temple Combined Cycle-Panda Power Funds
Bechtel, along with representatives from Panda Temple Power, LLC, an affiliate of Panda Power Funds, Siemens, and federal, state, and local dignitaries celebrated the groundbreaking of the Panda Temple Project. It was also announced that GE will be installing its zero liquid discharge (ZLD) wastewater treatment system at the 758 MW combined cycle plant. Once commissioned, the Temple plant will use treated water from a nearby wastewater treatment plan.
Revision Date: 2/13/2013
Tags: 221112 - Fossil Fuel 化石燃料, Panda Power, GE, Bechtel, Siemens, Zero Liquid Discharge System, Project, Zero Liquid Discharge, Wastewater Reuse, World Power Generation, USA