Internal Data Search by Company/Division Name
Summit Power IGCC Moving Forward
Summit Power Group said the IGCC power project near Penwell, TX, is still in the works. A Memorandum of Understanding signed last September with Sinopec Engineering Group and The Export-Import Bank of China slowed proceedings. As soon as financing is in place, the company plans to break ground on the project, perhaps in late summer.
Revision Date: 3/12/2013
Tags: 221112 - Fossil Fuel 化石燃料, Fluor Corporation, Linde Engineering, Siemens, Sinopec, Summit Power Group, Project, IGCC, USA
Summit Power (Texas Clean Energy) Will Use Scrubber and Wastewater Treatment
The Venturi scrubber system will require lots of wastewater treatment. Siemens has systems with two venture scrubbers and a demister all with bleed streams to wastewater treatment
Revision Date: 3/12/2013
Tags: 221112 - Fossil Fuel 化石燃料, Sinopec, Fluor Corporation, Siemens, Summit Power Group, Linde Engineering, Gasifier, Venturi Scrubber, Project, IGCC, USA