Yokogawa Wins Control System Order for First IGCC Power Plant in Korea
Yokogawa Electric Co. has been awarded a contract by Doosan Heavy Industries to supply a control system for the first integrated gasification combined cycle (IGCC) power plant in South Korea. The 300-MW facility is being constructed by Korea Electric Power Corp. (KEPCO) in Taean, South Korea, and is expected to be completed by the end of 2015.
Revision Date: 1/8/2013
Tags: 221112 - Fossil Fuel 化石燃料, Yokogawa Electric, Korea Electric Power Co. (KEPCO), IGCC, Integrated Control System, South Korea
Korea Electric Power is increasing Gas Turbine Capacity and replacing some Coal and Nuclear
Kepco has 34,000 MW of coal capacity. It is adding 1,000 MW of coal-fired capacity in 2020 but will retire 1,500 MW in 2021-2 and then 2,000 more MW of coal-fired capacity in 2023-30. IPPs will add 15,000 MW of thermal capacity during the period through 2030 for a total of 40,000 MW. Nuclear capacity will rise with three additions in the next four years, but with retirements will total only slightly less than the present 22,000 MW.
Revision Date: 12/14/2018
Tags: 221112 - Fossil Fuel 化石燃料, Korea Electric Power Co. (KEPCO), Investment