Internal Data Search by Company/Division Name
Cenal Elektrik is building a new 2x660 MW ultra-supercritical coal-fired power plant near Çanakkale on the coast of Turkey’s Sea of Marmara. Using the ultra-supercritical thermal power plant technology will increase the efficiency of the power plant while reducing its emissions. Sulzer was awarded for • 5 HPT boiler feedwater pumps • 5 HZB booster pump • 4 SJT condensate extraction pumps • 5 SJM circulating water pumps • 4 SMD closed-cycle cooling water pumps • 10 general service water pumps (LP heater drainage, steam turbine house sewage and air pre-heater LP flushing water pumps) Sulzer’s efficiency on boiler feedwater and circulating water pumps which was higher than competition made the difference.
Revision Date: 7/25/2019
Tags: 221112 - Fossil Fuel 化石燃料, Sulzer Pumps, Cenal Elektric