Internal Data Search by Company/Division Name

Data Search on:

The titles below have an association with your requested company name

Electric Power Conference, Chicago, Illinois, May 10-12, 2011 / Exhibitors

A number of air pollution system and coal fired boiler component suppliers, as well as some water oriented companies, will be exhibiting.

Revision Date:  3/9/2011

Tags:  221112 - Fossil Fuel 化石燃料, NeuCo, Metso, NWL Transformers, Nalco Mobotec, Milton Roy, Layne Christensen, KSB, Oak Park Chimney, KE Burgmann, Siemens Energy, Johnson Matthey, Horn Industrial Services, Kiewit Power Engineers, Paragon Airheater Technologies, Pennsylvania Crusher, Praxair, Roberts & Schaefer, CoaLogix, SOLVAir Solutions, SPX Flow Technology, Zachry, Veolia ES / Special Services, Swan Analytical Instruments, Hitachi Power Systems America, Hadek, Curtiss-Wright, International Chimney, Ovivo USA, Whiting Corporation, Vector Construction, Pentair Flow Technologies, Titan Fabrication, Sulzer Turbo Services, Pullman Energy Services, Nickel Systems, National Steel Erection, Air - Cure, Masaba Mining Equipment, National Steel City, Heyl & Patterson, FMC Corporation, East Jordan Iron Works, Degremont Technologies, Day & Zimmermann, Cambria Contracting, Burns & McDonnell, BRUKS Rockwood, Babcock & Wilcox, Grindex Pumps, Clyde Bergemann, Allied Environmental Solutions, Fujikin, Fuel Tech, FLSmidth, Everlasting Valve, Endress + Hauser, Eaton, DustMASTER Enviro Systems, Dustex, Donaldson, Graycor, Infilco Degremont, GE Energy, Chemco Systems, Calgon Carbon, Blome International, Barnhart Crane & Rigging, Apollo Valves, Atlas Copco, USA


Options for Upgrading Performance on an Underpeforming ESP - Electric Power May 10-12, 2011 by Phil Roberts, The Babcock & Wilcox Company

 

Revision Date:  5/11/2011

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Electrostatic Precipitator, Air Quality, USA


B&W Has Order for Palm Beach Waste to Energy Plant

B&W and BE&K, have been awarded a contract worth more than $668 million to engineer, design, procure and construct a new, 3000 tpdy state-of-the-art waste-to-energy power plant for the Solid Waste Authority (SWA) of Palm Beach County in West Palm Beach, Fla. B&W also was awarded a contract to provide operation and maintenance (O&M) services for the new facility. The first 10-year phase of the 20-year O&M agreement is valued at approximately $235 million. B&W will design and supply three mass burn boilers capable of generating up to 95 gross megawatts of electricity, grates, ash systems, metals recovery systems, emissions control equipment - including a dry flue gas desulfurization unit, baghouse, carbon injection and selective catalytic reduction system - duct work and other components. BE&K will provide the balance of plant equipment and construction services. B&W engineering, technical and support personal are expected to begin design work in Barberton this month. Furnace wall panels, boiler pressure parts and various components are targeted for fabrication in B&W's North American plants. The waste-to-energy plant is scheduled for commercial operation in spring 2015. This posting is courtesy of Industeel, a supplier of steel for boilers and other power plant components. www.babcock.com.

Revision Date:  5/25/2011

Tags:  221118 - Other Electric Power , Babcock & Wilcox, SWA Palm Beach County, Industeel, Fabric Filter, Injection System, Activated Carbon, Selective Catalytic Reduction, Spray Dryer Absorber, Boiler, Air Quality, Combustion


B&W Now Has N-Stamp Certification for Nuclear

Babcock & Wilcox Nuclear Operations Group, Inc. (B&W NOG) manufacturing facility in Euclid, Ohio, has received N-Stamp accreditation from the American Society of Mechanical Engineers. The certification is for assurance of materials, design, construction, operation, inspection and continuing maintenance of nuclear facilities. B&W's Mt. Vernon, Ind.; Barberton, Ohio; Lancaster, Ohio; and Cambridge, Ontario, Canada; facilities also hold N-Stamp certifications. This posting is courtesy of Industeel, a supplier of steel for boilers and other nuclear power plant components www.babcock.com.

Revision Date:  5/25/2011

Tags:  221113 - Nuclear Electric Power Generation * , Industeel, Babcock & Wilcox, American Society of Mechanical Engineers, Boiler, Certification, N-stamp, Steam Cycle


B&W to Collaborate With Toshiba on Power Generation Opportunities

B&W subsidiary Babcock & Wilcox Power Generation Group, Inc. (B&W PGG) has signed a memorandum of understanding with Toshiba Corporation (to cooperatively explore strategic, manufacturing, research and other opportunities in advanced supercritical power generation and solar energy technologies around the world. The memorandum outlines a framework under which B&W PGG and Toshiba can pursue technical collaboration on next generation thermal and solar technologies and explore cooperation on project opportunities in Asia, India and other emerging markets. For example, Toshiba is currently building a steam turbine and generator factory in India, and B&W PGG, through a joint venture, recently began construction on a boiler manufacturing plant near Pune, India. The companies intend to examine joint developments to leverage these unique capabilities and resources to supply the needs of customers in India and elsewhere. This posting is courtesy of Industeel, a supplier of steel for boilers and other nuclear power plant components www.babcock.com.

Revision Date:  5/25/2011

Tags:  221113 - Nuclear Electric Power Generation * , 221112 - Fossil Fuel 化石燃料, Industeel, Babcock & Wilcox, Toshiba, Boiler, Steam Cycle, India


B&W Volund to Build Waste to Energy Plant in Sweden

The Babcock & Wilcox subsidiary, Babcock & Wilcox Vølund A/S (B&W Vølund), has been awarded a contract worth more than $30 million to design and supply a boiler, combustion system, emissions control components and other equipment for the expansion of a waste-to-energy, combined heat and power plant in Lidköping, Sweden. The waste-to-energy plant, owned by Lidköping Värmeverk AB, produces electricity, hot water and district heating. Engineering work is currently underway. The project is scheduled for completion in early 2013. This posting is courtesy of Industeel, a supplier of steel for boilers and other power plant components. www.babcock.com.

Revision Date:  5/25/2011

Tags:  221118 - Other Electric Power , Lidkoping Varmewerk AB, Babcock & Wilcox, Industeel, Fabric Filter, Boiler, Air Quality, Combustion


B&W has SaskPower Order for Boundary Dam Life Extension

Babcock & Wilcox Canada Ltd. (B&W Canada) has been awarded a $107 million contract from SaskPower to engineer, manufacture, deliver and construct critical components for SaskPower's Boundary Dam Unit 3 in Estevan, Saskatchewan. The boiler retrofit for Boundary Dam Unit 3 is an integral part of the plant's life extension and conversion to allow for the capture of carbon dioxide through SaskPower's Integrated Carbon Capture and Storage Demonstration Project. , B&W Canada will engineer and supply all heat transfer surfaces and a new combustion system with low-NOx technology to provide SaskPower's Boundary Dam with a 30-year life extension and improved plant performance. The project is expected to be completed in August 2013. This posting is courtesy of Industeel, a supplier of steel for boilers and other power plant components. www.babcock.com

Revision Date:  5/25/2011

Tags:  221112 - Fossil Fuel 化石燃料, SaskPower, Industeel, Babcock & Wilcox, Low NOx Burner, Boiler, NOx, CO2 Capture


Solar Receiver for Concentrated Solar Designed and Installed by B&W

In 2008, Babcock & Wilcox PowerGeneration Group, Inc. (B&W PGG) was awarded a contract to designand manufacture a solar receiver to harness the sun’s energy to produce superheated steam to generate “green” electricity. In August 2009, Babcock & Wilcox Construction Co., Inc. (BWCC) installed the 50 ton (45,000 kg) receiver atop a 150 foot (46 m) high stand-alone tower. Because BWCC is a wholly owned subsidiary of B&W PGG, the material design and manufacturing supply were fully integrated into BWCC’s final installation plan. This close working relationship enabled the team to safely raise the solar receiver to its final position in less than six hours. Pictures and details are displayed on the B&W website

Revision Date:  6/1/2011

Tags:  221114 - Solar Power , Babcock & Wilcox, Construction, Concentrated Solar, Solar Receiver


Draft of Article on Materials for WESPS for Air Pollution Control: October 2011

Stainless and FRP are the most popular casing materials 3/16” and ¼ “ 2205 and 316L are most popular. Significant market in power plants for SO3 and air toxic removal.

Revision Date:  8/20/2011

Tags:  221112 - Fossil Fuel 化石燃料, 322110 - Pulp Mills , Babcock & Wilcox, Siemens, Southern Environmental, A.H. Lundberg Associates, Industeel, Alstom, Stainless Steel, Wet Electrostatic Precipitator, Oil Fired Boiler, Air Quality, Corrosion, Fabrication


Market for Small Modular Nuclear Stainless Plate

The plate and structural steel market for small modular nuclear reactors could rise from $100 million in 2013 to $500 million by 2020. With SMR Insights we have the opportunity to obtain contacts for all the key decision makers.

Revision Date:  8/22/2011

Tags:  221113 - Nuclear Electric Power Generation * , Babcock & Wilcox, Industeel, Nuclear Reactor, Stainless Steel, Market, Steam Production


Electric Power 2013 (Valves)

 

Revision Date:  5/3/2013

Tags:  221112 - Fossil Fuel 化石燃料, 325193 - Ethyl Alcohol Manufacturing , 325188 - All Other Basic Inorganic Chemical Manufacturing , 325131 - Inorganic Dye and Pigment Manufacturing 无机染料和颜料生产, Burns & McDonnell, SNC-Lavalin, Zachry, URS Corp., SPX Flow Technology, FLSmidth, Kvaerner, KSB, Kellogg Brown & Root LLC, Metso Minerals, Everlasting Valve, Babcock & Wilcox, Indeck Power Equipment, GEA Process Engineering, Day & Zimmermann, Allied Environmental Solutions, Valve, USA


Industrial Boiler MACT Proposed Rules and Compliance Strategies by Dave Novogoratz, Babcock & Wilcox - Hot Topic Hour November 18, 2010

Dave Novogoratz, Business Development Manager for the Particulate Control Group at Babcock & Wilcox Power Generation Group, Inc., indicated that the requirement for PM CEMS for boilers over 250 MMBtu/hr and for CO CEMS add some new challenges. The CO limit requirements may require thermal oxidizers or CO catalyst for grate-fired units. Wet ESPs may have a place downstream of wet particulate scrubbers to meet the new PM requirements. ACI, SDA, scrubbers, fabric filters, and oxidation catalyst might be options for dioxin and furan control. Compliance will require a system solution that also takes into account other upcoming regulatory requirements.

Revision Date:  11/18/2010

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Catalyst, Continuous Emissions Monitor, Spray Dryer Absorber, MACT, Industrial Boiler


Circulating Dry Scrubbers for PM2.5 Compliance by Terence Ake, Babcock & Wilcox - Hot Topic Hour - May 12, 2011

Terence Ake discussed circulating dry scrubbers for PM2.5 compliance

Revision Date:  5/12/2011

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Circulating Dry Scrubber, PM2.5


Status of Carbon Capture Programs and Technology - Webinar - Hot Topic Hour May 24, 2012

Current state of development of various CCS technologies, the economics, the potential carbon reductions achievable and the advantages or disadvantages of these various options.

Revision Date:  5/24/2012

Tags:  221112 - Fossil Fuel 化石燃料, Bluewave Resources, Babcock & Wilcox, Battelle, Oxyfuel, Carbon Capture, CO2 Sequestration


Status of B&W Carbon Capture Programs and Technology by Denny McDonald and Steve Moorman - Babcock & Wilcox - Hot Topic Hour May 24, 2012

Status of B&W's carbon capture programs and technologies.

Revision Date:  5/24/2012

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Oxyfuel, Carbon Capture


HRSG Design, Operation and Maintenance Considerations Webinar - Hot Topic Hour March 7, 2013

Design, installation, operation and maintenance of HRSGs for various applications.

Revision Date:  3/7/2013

Tags:  221112 - Fossil Fuel 化石燃料, Babcock Power, Clyde Bergemann, Babcock & Wilcox, Innovative Steam Technologies, Vertical Separator, Heat Recovery Steam Generator, Heat Recovery


Considerations for Long Service Life for Fast Start HRSGs by John DiVitto and Melvin Albrecht, Babcock & Wilcox - Hot Topic Hour March 7, 2013

Discussion of advantages of vertical separators.

Revision Date:  3/7/2013

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Vertical Separator, Heat Recovery Steam Generator, Heat Recovery


Monitoring and Optimizing Fuel Feed, Metering and Combustion in Boilers Webinar - Hot Topic Hour June 13, 2013.

Process of improving fuel feed.

Revision Date:  6/13/2013

Tags:  221112 - Fossil Fuel 化石燃料, Stock Equipment Co., Babcock & Wilcox, Combustion Technologies, Robert E. Sommerlad, Gravimetric Feeder, Monitoring, Combustion System, Burner, Boiler Efficiency, Carbon Monoxide, Cost, Combustion


EvenFlow Coal Flow Control System by Steve Ullom, Babcock and Wilcox - Hot Topic Hour June 13, 2013

Benefits of the Even Flow System for balancing fuel flow to burners.

Revision Date:  6/13/2013

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Combustion System, Monitoring, Burner, Boiler Efficiency, Carbon Monoxide, Combustion


Boosting SDA efficiency with DSI at Wygen 3

The SDA is challenged to meet efficiency when the flue gas temperature is low or the Sow concentration is high. B&W found out how to improve efficiency under thes conditions at Wgen 3 . the answer is to inject dry hydrated lime. So in effect you are combining DSI and SDA

Revision Date:  3/19/2014

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Black Hills Power, Spray Dryer Absorber, Direct Sorbent Injection, Lime


SDA units supplied by B&W are meeting MATS compliance

Five spray drier scrubber systems furnished by B&W are performing at well below the MATS HCl limit of 0.002 lbs/M btu, the mercury limit of 1.2 lbs/tmbtu, and the filterable pm limit of 0.03 lbs/MBTu

Revision Date:  3/19/2014

Tags:  221112 - Fossil Fuel 化石燃料, Babcock & Wilcox, Spray Dryer Absorber


Corrosion in alloy wet scrubber

B&W analyzed alloy failure in in the reaction tank of 2 absorbers and concluded the cause was fluoride under deposit attack on the 2205 walls.

Revision Date:  7/23/2014

Tags:  Babcock & Wilcox, Scrubber, FGD, Alloy, Corrosion


B&W Mitagent improves halogen use to oxidize mercury (EUEC 2015)

Summary: *Mitagent reduces injection cost for Iodine by 30‐50% while providing same 90+% Hg oxidation levels * Mitagent further improves Hg oxidation by 20‐30% for low Bromine application rates (25 ppm or less) * Mitagent reduces application rates by 30‐50% for high Bromine addition rates (>100 ppm), and therefore associated corrosion risks * Mitagent use results in significant operating cost reduction by reducing halogen usage * On going long‐term testing indicates no negative effect on boiler or AQCS performance

Revision Date:  2/25/2015

Tags:  221118 - Other Electric Power , Babcock & Wilcox, Bromide, Halogen, Mercury, Chemicals, Mercury Removal


B&W has sold 1,100 roll wheel pulverizers

B&W has designed, manufactured and placed in operation more than 1,100 roll wheel pulverizers, grinding a wide range of coals at power stations throughout the world. The B&W Roll Wheel® pulverizer has set the standard for high availability, reliable operation and low maintenance. These benefits contribute to stable steam generator performance regardless of station duty.

Revision Date:  12/2/2015

Tags:  221118 - Other Electric Power , Babcock & Wilcox, Pulverizer


MATS Mercury and HCl Control Requires More Power to the ESP and Careful Consideration of ESP Design Details

This paper discusses three projects in which low ripple three-phase power supplies (TPPS) were used as part of the solution in reducing the ESP PM emissions. TPPS have been used on coalfired boiler ESPs in Europe for many years, and in the past three years, Babcock & Wilcox (B&W) has more than 800 installations in China on cement kiln ESPs. Previous to this writing, there had been no installations of the TPPS in the United States (U.S.). 1. The Babcock & Wilcox Company, Barberton, Ohio, 2. Dynegy Wood River Generating Station, Alton, Illinois, 3. Duke Energy, Crystal River Generating Station, Crystal River, Florida. John A. Knapik, 1, Jia (Erick) Ma, 1, Steve Burgund, 2, Morgan Beveridge, 3, Steve Marchigiano, 3, and Michael Williams, 3;

Revision Date:  7/16/2019

Tags:  Babcock & Wilcox, Dynegy, Duke Energy, Europe, China


Upgrade FGD systems with an absorber tray says B&W

Retrofitting an absorber tray into an open spray tower is an effective way to maximize the contact between the flue gas and the slurry. The tray maximizes the contact between the gas and the slurry due to the vigorous frothing action that occurs on the tray. The absorber tray also evenly distributes the flue gas flow across the absorber cross-section, promoting optimum contact as the flue gas passes through the absorber spray levels.

Revision Date:  8/29/2019

Tags:  221118 - Other Electric Power , Babcock & Wilcox, Tray Scrubber, Upgrade