Internal Data Search by Company/Division Name

Data Search on:

The titles below have an association with your requested company name

Next Generation Nid for PC boilers - Electric Power May 10 - 12, 2011, Chicago, Illinois by Mark Fiedler, Principle Process Engineer, Alstom

The NID Dry Scrubber System is an advanced dry scrubber process that was developed by Alstom starting in the late 80's with commercial units in operation since 1996. The system allows for SO2 removal rates greater than 98% with the ability to operate with high Sulfur fuels that would be beyond the capabilities of traditional SDA dry scrubber systems. This presentation will provide on overview of the NID system, highlight recent developments in the technology, and introduce several NID reference units within the U.S. and Europe as well as a few new projects currently in execution.

Revision Date:  5/11/2011

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, Absorber, Spray Dryer, Air Quality, USA


Power-Gen India & Central Asia, Pragati Maidan, New Delhi, India, May 5-7, 2011

POWER-GEN India & Central Asia 2011 is one of the region's most important power related conference and exhibition. This premier annual event brings together leading industry players from around the world as well as the latest in products and technologies by influential companies. Networking and business opportunities are also a key aspect of POWER-GEN India & Central Asia 2011 where professionals and companies are able to establish or further business interests in one of the world's most dynamic power markets.

Revision Date:  5/10/2011

Tags:  221112 - Fossil Fuel 化石燃料, Sandvik, TLT-Babcock, Victaulic, Hilliard, Spectrum Filtration, Siemens, Shenyang Dongguan Power Technology, Shandong Weichai Huafeng Power, BWE Energy, Flaktwoods, Alstom, Endress + Hauser, AECOM, Qingdao Songling Power Environmental Equipment, Bachmann Industries, Camfil Farr, Durag, Filsep Equipment, GEA Heat Exchange, Beijing Longyuan Cooling Technology, Graver Water Systems, Hamon, Hitachi India, ION Exchange, Mitsubishi Heavy Industries, Ovivo Water, Power Generation, India


Draft of Article on Materials for WESPS for Air Pollution Control: October 2011

Stainless and FRP are the most popular casing materials 3/16” and ¼ “ 2205 and 316L are most popular. Significant market in power plants for SO3 and air toxic removal.

Revision Date:  8/20/2011

Tags:  221112 - Fossil Fuel 化石燃料, 322110 - Pulp Mills , Babcock & Wilcox, Siemens, Southern Environmental, A.H. Lundberg Associates, Industeel, Alstom, Stainless Steel, Wet Electrostatic Precipitator, Oil Fired Boiler, Air Quality, Corrosion, Fabrication


Alstom to Provide HRSGs to 1300 MW Brunswick County

Alstom has been awarded a contract by Fluor Corp. to provide three heat recovery steam generators (HRSGs) for Dominion Virginia Power's 1,300 MW Brunswick County Power Station that will come online in 2016. These units will incorporate Alstom's Optimized for Cycle and Constructability design, which offers better performance during plant cycling and a lower overall cost of construction. SCR and carbon monoxide catalyst technology embedded in the HRSGs will reduce overall emissions.

Revision Date:  11/27/2012

Tags:  221112 - Fossil Fuel 化石燃料, Fluor Corporation, Dominion, Alstom, Mitsubishi Power Systems, Heat Recovery Steam Generator, Project, World Power Generation, USA


Mitchell Combined Cycle Plant-FGE Texas

FGE Texas LLC, a wholly owned subsidiary of FGE Power LLC, has announced plans to build a new 726 MW gas-fired power plant in Mitchell County, Texas. The 2x1 combined cycle power plant will use Alstom Thermal Power's next generation KA-24 platform and is due to be one of the most efficient gas plants in the Electric Reliability Council of Texas (ERCOT). Construction is scheduled to begin in 2013 and the new plant should begin commercial operation in 2016.

Revision Date:  4/15/2013

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, FGE Power, Gas Turbine, Project, World Power Generation, USA


Carbon Management Programs for Fossil-fueled Boilers - Webinar March 31, 2011

Three speakers discussed regulation of greenhouse gases, CO2 capture and storage, reduction through energy efficient in coal-fired boilers.

Revision Date:  3/31/2011

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, EPRI, Andover Technology Partners, CO2


CO2 Reduction through Energy Efficiency in Coal-fired Boilers by Jim Sutton, Alstom - Hot Topic Hour March 31, 2011

Jim Sutton, Director at Alstom Power, discussed CO2 reduction through increasing energy efficiency in coal-fired boilers. Lots of CO2 could be avoided by making improvements in many areas. For example just using a more efficient transformer rectifier with a precipitator significantly reduced the parasitic load. There is a huge potential when the average heat rate for the U.S. fleet is 10,761 Btu/kW-hr for an efficiency of only 31 percent. Jim showed a group of older power plants with heat rates above 15,000 Btu/kW-hr, so the potential CO2 reduction for these old power plants is very large.

Revision Date:  3/31/2011

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, CO2


PSM / Alstom Company Profile in the Combined Cycle Journal, October 1, 2013

PSM, An Alstom Company, is a full service provider to gas turbine equipped power plants, offering technologically advanced aftermarket turbine components & performance upgrades, parts reconditioning, field services and flexible Long Term Agreements (LTAs) to the worldwide power generation industry. Our product lines include stationary and rotating compressor and turbine airfoils, ultra-low emission combustion systems, and other capital parts for Frame 6B, 7E/EA, 9E and 7FA machines as well as the 501B6, 501D5 and 501F engines.

Revision Date:  10/23/2013

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, Service & Repair, Parts Supplier, Combined Cycle Journal


Alstom NID is installed in coal fired power plants as well as incinerators and steel mills

Alstom has a number of installations of a unique type of CDS scrubber desgignated NID. There are a number of installations including 5,000 MW in China and units as large as 585 MW in the U.S. A unit is slated for TVA Gallatin. Two 660 MW systems are being installed at Homer City.

Revision Date:  4/2/2014

Tags:  221112 - Fossil Fuel 化石燃料, Alstom, Circulating Dry Scrubber