Internal Data Search by Product

Product Name:

Align SCR Start/Stop Sequence with GT Fast-Start Sequence

The gas turbines at the Turlock Almond Plant in California were designed for 10-minute start capability, but sub-controls for the emission reduction systems were not. This case study reviews necessary changes that were made to the controls in the Ovation balance-of-plant distributed control system (DCS).

Revision Date:  6/26/2015

Tags:  221112 - Fossil Fuel 化石燃料, Distributed Control System, SCR, Fast Start, Startup, Combined Cycle Journal, USA