Valley Will Use Treated Wastewater for Boiler Feed and Will Have Small Wastewater Treatment System

This project will use treated wastewater for  boiler feed water and will use air cooled condensers from the Middletown sewage treatment plants 

http://www.cpvvalley.com/pdf/CPV_Valley_FEIS/Volume%20I_FEIS_CPV_Valley_Energy/FEIS_Sections_1_to_5.pdf

 there will be a wastewater treatment systems for blowdown from the HRSG systems, for discharge from the oil , water separator, backwash from demineralizer microfiltration unit and others

http://cpvvalley.com/pdf/approval-process/Volume%20I/CPVValleyDEISSections1thru19.pdf

World Power Generation Projects

Project Title:

     First Entry Date: 5/1/2012
     Revision Date: 5/1/2012

                 Location: NY   Wayawanda
                 Startup Date: 2015
                 Size: 650  MW
                 Primary Fuel: Gas    
                 Secondary Fuel:  
                 Duct Burner:      
                 Duct Burner Supplier:  
                 Oxidation Catalyst:      
                 Oxidation Catalyst Supplier:
  
                 NOx Limit:             
                 CO Limit:
  
                 VOC Limit:             
                 PM limit:
  
                 SO2 Limit:              
                 NH3 limit:  

          Description:
         
  


 Contractor 

 Contractor Comment

No contractors listed for this project.

 

 NOx Control Type

 Supplier

No NOx control information available.