Valley Will Use Treated Wastewater for Boiler Feed and Will Have Small Wastewater Treatment System
This project will use treated wastewater for boiler feed water and will use air cooled condensers from the Middletown sewage treatment plants
there will be a wastewater treatment systems for blowdown from the HRSG systems, for discharge from the oil , water separator, backwash from demineralizer microfiltration unit and others
http://cpvvalley.com/pdf/approval-process/Volume%20I/CPVValleyDEISSections1thru19.pdf
World Power Generation Projects
Project Title: |
|
First Entry Date: 5/1/2012
Revision Date: 5/1/2012
Location: NY Wayawanda
Startup Date: 2015
Size: 650 MW
Primary Fuel: Gas
Secondary Fuel:
Duct Burner:
Duct Burner Supplier:
Oxidation Catalyst:
Oxidation Catalyst Supplier:
NOx Limit:
CO Limit:
VOC Limit:
PM limit:
SO2 Limit:
NH3 limit:
Description:
Contractor |
Contractor Comment |
No contractors listed for this project. |
NOx Control Type |
Supplier |
No NOx control information available. |