FGD
§ Emission Controls Planned for 585-MW Boswell 4
§ Kincaid to Retrofit SBC Injection
§ Ameren Wants Until 2020 to Meet SO2 Limits
§ Weston 3 to Retrofit ReACT
§ B. L. England to Convert to Natural Gas-firing
§ PJM Determines FirstEnergy Plants Cannot Close Until 2015
§ Status of FGD in India
§ ERG Delivered Polishing FGD for Ferrybridge Carbon Capture Project
§ ADA-ES CyClean System for Cyclone-fired Boilers Firing PRB Coal
§ Alabama Power to Connect Gaston to Natural Gas Line
§ Scrubber at 800-MW Big Sandy on Hold
§ SCE&G Announces Switches to Natural Gas and Power Plant Closures
NOx
§ Dry Scrubber Users 2012 Conference
§ GenOn Plans SCR on Gas Turbines and Coal-fired Power Plants
§ PMFG to Provide SCR for Fractionation Facility
§ Chalk Point Must Primarily Fire Natural Gas
§ Nonattainment Areas for 2008 Ozone Standard
§ PSEG Starting Up Six Gas Turbines with Four Foot Deep Catalyst Beds
§ Studstrupværket 3 and 4 Use SINOx® Plate Catalyst for Replacement
ELECTRIC POWER CONFERENCE
§ Overview
§ Nalco’s Mer-Control 8034 Reduces Mercury Re-Emission from Wet FGD Systems
§ Both Sonic Horns and Air Cannons for Less Ash Buildup before SCR
§ Keep Trona Below 130oF Before Injection to Improve Performance
MERCURY
§ Midwest Energy Emissions’ ME2C Demo at Midwest EGU
§ Mer-Cure at 2100-MW Colstrip Operating 2+ Years